About your Search

20100901
20100930
SHOW
STATION
SFGTV 4
LANGUAGE
Search Results 0 to 3 of about 4 (some duplicates have been removed)
send a letter to new jersey or virginia, it cost the same amount. levels of service at time of use are not differentiated. based upon our research, if you go to the bottom of that page, that is rarely ever used in power rate setting. you would imagine not a lot of proposals will be before you for that in late november and early december, nor before right fairness. however, in class differentiated, that is where we looked at residential demand verses commercial demand -- versus commercial demand, we can separate large businesses or so families or anything else. that is frequently used in water, waste water, and power setting. the next category of rates is two part rates. this is what you have now for the water bill, where we have a charge that represents 20% of the average bill related to fixed equipment and fixed capital costs. then there is an 80% volumetric where the more you use the more you are billed -- volumje metric where the more you use the more you are billed. tiered -- if you are a super user, it is there a way to structure a discount for people with low usage tax on wat
to virginia takes a lot more cost and delivering mail to palo alto. that is a classic example for us delivering a lot of power to a big customer versus a little power to a household. there will be cost differences in uniform does not allow you to adjust. the other example would be energy efficiency conservation. if you charge everyone the same price, it is not a good policy lever because they are not provided incentive to conserve. what is interesting is we are looking at these different rate models and looking at the criteria the charter requires and are seeing how dependent upon the great design methodology that we looked at, and we are going to look at all of them -- rate design methodology that we look at, and we are going to look at all of them, there are going to be different advantages and costs. for instance, getting over to time of use and seasonally adjusted is not easy to communicate, but it allows us to possibly implement policy directives and policy issues that are important to the commission. the rates to be considered in early december specifically our retail, resident
Search Results 0 to 3 of about 4 (some duplicates have been removed)